ep

January 22, 2021

SMR Gearbox Set up
Satisfactory functionality depends on correct installation. lubrication and maintenance. for that reason it is crucial the directions in the installation and upkeep leaflet. supplied with each gearbox. are followed cautiously. a number of the vital aspects of belt and torque-arm installation are listed under.
1. Install pulley on gearbox input shaft as shut on the reducer feasible, and mount reducer on driven shaft as shut to bearing as practical. failure to carry out this will lead to excess loads within the input shaft bearings and output bearings and could cause their premature failure.
2. Install motor and wedge belt drive using the belt pull at somewhere around 90° towards the center line involving driven and input shafts. this can allow tensioning with the wedge belt drive with the torque arm which must ideally be in stress. if output hub runs anti-clockwise. torque arm really should be positioned the right.
3. lnstall torque-arm fulcrum on the rigid assistance to ensure that the torque-arm might be at about ideal angles on the center line through the driven shaft along with the torque arm situation bolt. ensure there is certainly sufficient take up within the turnbuckle for belt stress adjustment.
Keep close.
Bell drive could be situated in any practical postion. in the event the torque arm should be to be used to tighten the belts, the drive should be at about tight angle on the line among the input and output shafts.
Bell drive could be found towards the proper if wanted.
If output hub rotates clock-wise. place belt drive and torque arm in opposite path to that proven in the illustration.
Torque arm and belt take up.
Torque arm could possibly be mounted on the ideal if wanted.